Skip to content
SLA Information System Gapura Angkasa
SLA Information System Gapura Angkasa
Back

Performance TG CGK

Parking StandFibagLabag
Air Bridge parkingNB: <= ATA +15 mnt
WB: <= ATA +15 mnt
NB: <= ATA +30 mnt
WB: <= ATA +30 mnt
Remote bayNB: <= ATA +12 mnt
WB: <= ATA +12 mnt
NB: <= ATA +20 mnt
WB: <= ATA +20 mnt
KeteranganDeskripsi
Open Check-in–
Close Check-in30 minutes to STD
Open Gate• Pre-boarding information announcement must be performed at -40 minutes to ETD
• Boarding must start according to TG procedure by priority boarding sequence at 30 minutes to ETD
• in case of delay boarding, announcement must be no later than at -30 minutes to ETD
• information regarding boarding time must be announced at lounge at -30 minutes to ETD
• final call must be made at -15 minutes to ETD
Cabin Cleaning• Cleaning must start after last pax disembarked at + 15 from ATA
• Cleaning must complate according to TG specifications and time schedules at + 40 from ATA
OTP–
Target & Waktu• Loadsheet di serahkan ke PIC (20 minutes to ETD)
• Dokumen Penerbangan diberikan dalam waktu (40 minutes from ATD)
• Marshaler, Wingman, Security harus siap di stand parkir pesawat (65 minutes from ATD)
• GSE beserta operator, petugas Ramp, Load Master, porter & Cleaning service harus di stand parkir pesawat (60 minutes from ATD)

© 2025 All right reserved by Gapura Angkasa